{"id":6354,"date":"2022-10-13T17:17:45","date_gmt":"2021-07-15T10:17:45","guid":{"rendered":"https:\/\/ceco.vn\/le-khoi-cong-du-an-khai-thac-va-che-bien-muoi-mo-tai-cong-hoa-dan-chu-nhan-dan-lao\/"},"modified":"2026-11-03T20:44:34","modified_gmt":"2026-11-03T13:44:34","slug":"le-khoi-cong-du-an-khai-thac-va-che-bien-muoi-mo-tai-cong-hoa-dan-chu-nhan-dan-lao","status":"publish","type":"post","link":"https:\/\/ceco.com.vn\/en\/le-khoi-cong-du-an-khai-thac-va-che-bien-muoi-mo-tai-cong-hoa-dan-chu-nhan-dan-lao\/","title":{"rendered":"Groundbreaking Ceremony for the Rock Salt Mining and Processing Project in the Lao PDR"},"content":{"rendered":"<div class=\"ceco-en-content\" data-no-translation><div>\n<p>This is a particularly important project and one of Vietnam's largest overseas investment projects. Assigned by the Government to the Vietnam National Chemical Group (Vinachem) as the investor, the project covers a mining area of 10 km2 with a capacity of 320,000 tons\/year and a total investment of USD 522 million. Upon completion, the project will significantly reduce potash fertilizer imports for both Vietnam and Laos, while addressing the current surplus of table salt and shortage of industrial and high-grade salt in Vietnam.<\/p>\n<p>Attending the groundbreaking ceremony were leadership representatives from central Ministries, Departments, Sectors, and local authorities of both Governments. Representing Vinachem were Mr. Nguyen Anh Dung \u2013 Party Secretary and Chairman of the Board of Members, Mr. Nguyen Gia Tuong \u2013 General Director, and other senior Group leaders. On the side of CECO, a member of the <img class=\"cke_anchor\" title=\"Anchor\" src=\"https:\/\/ceco.com.vn\/wp-content\/uploads\/2023\/03\/spacer.gif\" alt=\"Anchor\" align=\"\" data-cke-realelement=\"%3Ca%20data-cke-saved-name%3D%22OLE_LINK23%22%20name%3D%22OLE_LINK23%22%3E%3C%2Fa%3E\" data-cke-real-node-type=\"1\" data-cke-real-element-type=\"anchor\" \/><img class=\"cke_anchor\" title=\"Anchor\" src=\"https:\/\/ceco.com.vn\/wp-content\/uploads\/2023\/03\/spacer.gif\" alt=\"Anchor\" align=\"\" data-cke-realelement=\"%3Ca%20data-cke-saved-name%3D%22OLE_LINK22%22%20name%3D%22OLE_LINK22%22%3E%3C%2Fa%3E\" data-cke-real-node-type=\"1\" data-cke-real-element-type=\"anchor\" \/><a name=\"OLE_LINK21\" data-cke-saved-name=\"OLE_LINK21\"><\/a>TTCL-K-UTEC-CECO contractor consortium, Mr. Do Hien Ngang \u2013 Chairman of the Board of Directors, Mr. Nguyen Manh Hung \u2013 Company Director, along with leadership representatives and company units attended the ceremony.<\/p>\n<p style=\"text-align: center;\"><img style=\"width: 590px; height: 337px; border-width: 1px; border-style: solid;\" src=\"http:\/\/ceco.com.vn\/Portals\/0\/VT_Articles\/2015\/9\/14\/c0c396c0aa2445e8aeca807e3c2f7055\/anh2_1.jpg\" alt=\"\" data-cke-saved-src=\"http:\/\/ceco.com.vn\/Portals\/0\/VT_Articles\/2015\/9\/14\/c0c396c0aa2445e8aeca807e3c2f7055\/anh2_1.jpg\" \/><\/p>\n<p>Package No. 10 is the main package of the project, covering \"Engineering, procurement of materials and equipment, construction and installation, training, technology transfer, commissioning, start-up, acceptance, and handover of the rock salt mining and processing plant in Laos (EPC).\" The winning bidder is the <img class=\"cke_anchor\" title=\"Anchor\" src=\"https:\/\/ceco.com.vn\/wp-content\/uploads\/2023\/03\/spacer.gif\" alt=\"Anchor\" align=\"\" data-cke-realelement=\"%3Ca%20data-cke-saved-name%3D%22OLE_LINK17%22%20name%3D%22OLE_LINK17%22%3E%3C%2Fa%3E\" data-cke-real-node-type=\"1\" data-cke-real-element-type=\"anchor\" \/><img class=\"cke_anchor\" title=\"Anchor\" src=\"https:\/\/ceco.com.vn\/wp-content\/uploads\/2023\/03\/spacer.gif\" alt=\"Anchor\" align=\"\" data-cke-realelement=\"%3Ca%20data-cke-saved-name%3D%22OLE_LINK16%22%20name%3D%22OLE_LINK16%22%3E%3C%2Fa%3E\" data-cke-real-node-type=\"1\" data-cke-real-element-type=\"anchor\" \/><a name=\"OLE_LINK15\" data-cke-saved-name=\"OLE_LINK15\"><\/a>TTCL-K-UTEC-CECO contractor consortium with a contract price of USD 334.2 million under a lump-sum contract and a 40-month execution period, in which the scope of work directly undertaken by CECO is valued at approximately VND 1,600 billion.<\/p>\n<p style=\"text-align: center;\"><img style=\"width: 590px; height: 393px; border-width: 1px; border-style: solid;\" src=\"http:\/\/ceco.com.vn\/Portals\/0\/VT_Articles\/2015\/9\/14\/c0c396c0aa2445e8aeca807e3c2f7055\/11836755_643470969089754_6725954961661077915_n_1.jpg\" alt=\"\" data-cke-saved-src=\"http:\/\/ceco.com.vn\/Portals\/0\/VT_Articles\/2015\/9\/14\/c0c396c0aa2445e8aeca807e3c2f7055\/11836755_643470969089754_6725954961661077915_n_1.jpg\" \/><\/p>\n<p>The rock salt mining project in Laos is a key project of the Vietnam National Chemical Group. Winning this major EPC contract by the TTCL-K-UTEC-CECO consortium affirms the capability and reputation of CECO and its consortium partners. Implementing this specialized overseas project\u2014featuring complex technology executed for the first time\u2014with the determination of all CECO staff to meet the committed schedule and quality will create a breakthrough for the Company's business operations and affirm CECO as Vietnam's leading domestic EPC contractor for key projects in the chemical industry.<\/p>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The USD 522 million Rock Salt Mining and Processing Project in Laos (320,000 tons\/year), with CECO in the TTCL-K-UTEC-CECO EPC consortium for Package No. 10 (USD 334.2 million), held its groundbreaking ceremony.<\/p>","protected":false},"author":1,"featured_media":4920,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,1],"tags":[],"class_list":["post-6354","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-cong-ty","category-tin-tuc"],"acf":[],"_links":{"self":[{"href":"https:\/\/ceco.com.vn\/en\/wp-json\/wp\/v2\/posts\/6354","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ceco.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ceco.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ceco.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ceco.com.vn\/en\/wp-json\/wp\/v2\/comments?post=6354"}],"version-history":[{"count":3,"href":"https:\/\/ceco.com.vn\/en\/wp-json\/wp\/v2\/posts\/6354\/revisions"}],"predecessor-version":[{"id":10202,"href":"https:\/\/ceco.com.vn\/en\/wp-json\/wp\/v2\/posts\/6354\/revisions\/10202"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ceco.com.vn\/en\/wp-json\/wp\/v2\/media\/4920"}],"wp:attachment":[{"href":"https:\/\/ceco.com.vn\/en\/wp-json\/wp\/v2\/media?parent=6354"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ceco.com.vn\/en\/wp-json\/wp\/v2\/categories?post=6354"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ceco.com.vn\/en\/wp-json\/wp\/v2\/tags?post=6354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}